International

Timetable・Charge

Countermeasures taken against novel coronavirus infection spread

The Japanese government is making additional efforts toward the drastic bolstering of border security measures against the novel coronavirus (COVID-19), and various other countries are bolstering their own measures against the virus as well. In light of this and with passenger demand falling, we have decided to make changes to some of our international routes and/or the number of flights that we plan to operate.
For more information, please see here.
We apologize for any inconvenience.

Timetable

TRANS-PACIFIC
2020 Summer07/07 ver. Applicable Period 03/29~10/24
EUROPE
2020 Summer03/27 ver. Applicable Period 03/29~10/24
East Asia
2020 Summer05/15 ver. Applicable Period 03/29~10/24
Southeast Asia/South Asia
2020 Summer03/27 ver. Applicable Period 03/29~10/24
JAPAN CONNECTIONS
2020 Summer04/01 ver. Applicable Period 03/29~10/24
ALL AREAS
2020 Summer07/07 ver. Applicable Period 03/29~10/24
FREIGHTER
2020 Summer03/20 ver. Applicable Period 03/29~10/24
JOINT VENTURE UA
2020 Summer03/20 ver. Applicable Period 03/29~10/24
JOINT VENTURE LH
2020 Summer03/20 ver. Applicable Period 03/29~10/24
Past Timetables

Timetable

TRANS-PACIFIC
2019 Winter02/12 ver. Applicable Period 10/27~03/28
2019 Summer10/01 ver. Applicable Period 03/31~10/26
EUROPE
2019 Winter01/31 ver. Applicable Period 10/27~03/28
2019 Summer07/02 ver. Applicable Period 03/31~10/26
East Asia
2019 Winter01/29 ver. Applicable Period 10/27~03/28
2019 Summer04/15 ver. Applicable Period 03/31~10/26
Southeast Asia/South Asia
2019 Winter10/23 ver. Applicable Period 10/27~03/28
2019 Summer03/18 ver. Applicable Period 03/31~10/26
JAPAN CONNECTIONS
2019 Winter10/08 ver. Applicable Period 10/27~03/28
2019 Summer03/18 ver. Applicable Period 03/31~10/26
ALL AREAS
2019 Winter02/12 ver. Applicable Period 10/27~03/28
2019 Summer10/01 ver. Applicable Period 03/31~10/26
FREIGHTER
2019 Winter12/25 ver. Applicable Period 10/27~03/28
2019 Summer03/31 ver. Applicable Period 03/31~10/26
JOINT VENTURE UA
2019 Winter01/06 ver. Applicable Period 10/27~03/28
2019 Summer03/28 ver. Applicable Period 03/31~10/31
JOINT VENTURE LH
2019 Winter10/10 ver. Applicable Period 10/27~03/28
2019 Summer04/16 ver. Applicable Period 03/31~10/26

Charges for Shipments of Dangerous Goods

Charges for Shipments of Dangerous Goods